IAEA Review of Safety-Related Aspects of Handling ALPS-Treated Water at TEPCO’s Fukushima Daiichi Nuclear Power Station
Corroboration of External Exposure Monitoring
-
30 September 2023
IAEA Review of Safety Related Aspects of Handling ALPS Treated Water at TEPCO’s Fukushima Daiichi Nuclear Power Station
Independent Sampling and Analysis for the Determination of Radionuclides in Samples of ALPS Treated Water from Tank Group K4-A
-
22 September 2023
IAEA Review of Safety Related Aspects of Handling ALPS Treated Water at TEPCO’s Fukushima Daiichi Nuclear Power Station
Independent Sampling and Analysis for the Determination of Radionuclides in ALPS Treated Water
-
31 May 2023
First Interlaboratory Comparison on the Determination of Radionuclides in ALPS Treated Water
The report covers the first ILC under the IAEA’s ALPS safety review concerning water samples taken in March 2022 from the tanks at the Fukushima Daiichi nuclear power station.
-
4 May 2023
Report 5: Review Mission to NRA (January 2023)
The report compiles the findings from the second IAEA mission to assess NRA’s activities related to the discharge in March 2022.
-
5 April 2023
Report 4: Review Mission to TEPCO and METI (November 2022)
The report compiles the findings from the IAEA’s second safety review mission to TEPCO and METI in November 2022.
-
29 December 2022
Report 3: Status of IAEA’s Independent Sampling, Data Corroboration, and Analysis
The report summarizes the main elements of the IAEA’s corroboration activities and explains the methodologies to be used. It provides an update on the progress made to date in this work, as of December 2022.
-
16 June 2022
Report 2: Review Mission to NRA (March 2022)
The report compiles the findings from the first IAEA mission to assess NRA’s activities related to the discharge in March 2022
-
29 April 2022
Report 1: Review Mission to TEPCO and METI (February 2022)
The report compiles the findings from the IAEA’s first safety review mission to TEPCO and METI in February 2022.