• English
  • العربية
  • 中文
  • Français
  • Русский
  • Español

You are here

Japan's Reports on Conditions at TEPCO's Fukushima Daiichi Nuclear Power Station

On 16 April 2014, Japan provided the IAEA with information about the accidental transfer of contaminated water from the Central Waste Building to the Incineration Building, both located onsite at TEPCO's Fukushima Daiichi Nuclear Power Station (NPS), and which was reported on 13 April 2014. None of this water was reported to have leaked outside.

TEPCO has provided a bit more detailed figure of the configuration here and here.

TEPCO also provided information on a very minor leak here.

 

Last update: 27 Jul 2017

Stay in touch

Newsletter