YANGJIANG-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
China Guangdong Nuclear Power Group
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
17 Nov, 2012
30 Dec, 2016
First Grid Connection Commercial Operation Date
08 Jan, 2017
15 Mar, 2017

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
6.76 TW.h
90.7 %
86.5 %
9.3 %
90.3 %
Lifetime performance calculated up to year 2017

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2017 6759.710 1000 6353 86.5 90.7 90.7 90.3 90.3
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2018-05-20

Previous  (YANGJIANG-3) (YANGJIANG-5)  Next