ATUCHA-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
PHWR KWU
NUCLEOELECTRICA ARGENTINA S.A.
NUCLEOELECTRICA ARGENTINA S.A.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
693 MWe
692 MWe
745 MWe
2160 MWt
Construction Start Date First Criticality Date
14 Jul, 1981
03 Jun, 2014
First Grid Connection Commercial Operation Date
27 Jun, 2014
26 May, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
13.58 TW.h
66.8 %
70.0 %
33.2 %
65.8 %
Lifetime performance calculated up to year 2017

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 1093.350 692 3071
2015 3925.920 692 6928
2016 5200.540 692 8063 89.5 84.6 84.6 83.8 83.8
2017 3356.610 693 5130 58.6 56.3 66.8 55.3 65.8
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2018-05-24