TIANWAN-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-428M
China National Nuclear Corporation
Jiangsu Nuclear Power Corporation
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1060 MWe
1060 MWe
1126 MWe
3000 MWt
Construction Start Date First Criticality Date
27 Dec, 2012
29 Sep, 2017
First Grid Connection Commercial Operation Date
30 Dec, 2017
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.00 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 2017

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2017 1.840 1060 30
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2018-04-25