CHANGJIANG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
China National Nuclear Corporation
Hainan nuclear power company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
601 MWe
601 MWe
650 MWe
1930 MWt
Construction Start Date First Criticality Date
25 Apr, 2010
12 Oct, 2015
First Grid Connection Commercial Operation Date
07 Nov, 2015
25 Dec, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
3.66 TW.h
94.0 %
93.2 %
6.0 %
68.5 %
Lifetime performance calculated up to year 2016

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 43.730 610 1006
2016 3617.230 601 8185 93.2 94.0 94.0 68.5 68.5
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2017-03-28