FUQING-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-1000
China National Nuclear Corporation
CNNC Fujian Fuqing Nuclear Power co.,LTD
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1089 MWe
2905 MWt
Construction Start Date First Criticality Date
31 Dec, 2010
03 Jul, 2016
First Grid Connection Commercial Operation Date
07 Sep, 2016
24 Oct, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.16 TW.h
100.0 %
100.0 %
0.0 %
98.6 %
Lifetime performance calculated up to year 2016

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 1628.310 1000 1648 100.0 100.0 100.0 98.6 98.6
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2017-06-24