NINGDE-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
China Guangdong Nuclear Power Group
Fujian Ningde Nuclear Power Company Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1018 MWe
1018 MWe
1080 MWe
2905 MWt
Construction Start Date First Criticality Date
12 Nov, 2008
20 Dec, 2013
First Grid Connection Commercial Operation Date
04 Jan, 2014
04 May, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
6.57 TW.h
99.8 %
100.0 %
0.2 %
97.6 %
Lifetime performance calculated up to year 2014

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 6568.050 1018 7044 100.0 99.8 99.8 97.6 97.6
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2015-07-04

Previous  (NINGDE-1) (NINGDE-3)  Next