TAISHAN-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
EPR-1750
Guangdong Taishan Nuclear Power Joint Venture Company Limited (TNPC)
Guangdong Taishan Nuclear Power Joint Venture Company Limited (TNPC)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1660 MWe
1660 MWe
1750 MWe
4590 MWt
Construction Start Date First Criticality Date
18 Nov, 2009
06 Jun, 2018
First Grid Connection Commercial Operation Date
29 Jun, 2018
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2017

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2018-07-19

Previous  (SHIDAO BAY-1) (TAISHAN-2)  Next