SHIN-KORI-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1340 MWe
1400 MWe
1400 MWe
3983 MWt
Construction Start Date First Criticality Date
16 Oct, 2008
29 Dec, 2015
First Grid Connection Commercial Operation Date
15 Jan, 2016
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2014

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2016-08-29