SHIN-KORI-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
997
MW
e
995
MW
e
1046
MW
e
2825
MW
t
Construction Start Date
First Criticality Date
05 Jun, 2007
27 Dec, 2011
First Grid Connection
Commercial Operation Date
28 Jan, 2012
20 Jul, 2012
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
40.00 TW.h
80.9 %
81.8 %
19.1 %
80.6 %
Lifetime performance calculated up to year
2017
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2012
5400.280
997
5897
100.0
99.8
99.8
98.0
98.0
2013
3560.310
1000
3569
40.7
40.6
58.0
40.6
57.6
2014
8304.890
998
8518
97.2
96.0
73.7
95.0
73.0
2015
7405.240
996
7604
86.8
84.9
77.0
84.9
76.5
2016
6627.860
997
6718
76.5
75.7
76.7
75.7
76.3
2017
8699.480
997
8760
100.0
99.6
80.9
99.6
80.6
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2018-04-21
Previous
(SHIN-KORI-1)
(SHIN-KORI-3)
Next
KOREA, REPUBLIC OF
HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-1
SHIN-KORI-2
SHIN-KORI-3
SHIN-KORI-4
SHIN-KORI-5
SHIN-WOLSONG-1
SHIN-WOLSONG-2
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4