Reactor Details

Reactor Type Model Owner Operator
VVER V-412
'Nuclear Power Corporation Of India Ltd.
'Nuclear Power Corporation Of India Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
917 MWe
917 MWe
1000 MWe
3000 MWt
Construction Start Date First Criticality Date
31 Mar, 2002
13 Jul, 2013
First Grid Connection Commercial Operation Date
22 Oct, 2013
31 Dec, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
2.54 TW.h
Lifetime performance calculated up to year 2014

Operating History

Year Electricity Supplied
Reference Unit Power
Annual Time On Line
Operation Factor
Energy Availability Factor
Load Factor
Annual Cumulative Annual Cumulative
2013 0.290 917 661
2014 2542.230 917 4212
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS

Above data are from the PRIS database. Last update on 2015-10-07