LUNGMEN 2

Under Construction


Reactor Details

Reactor Type Model Owner Operator
BWR
ABWR
Taiwan Power Co.
Taiwan Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1300 MWe
1300 MWe
1350 MWe
3926 MWt
Construction Start Date First Criticality Date
30 Aug, 1999
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data are from the PRIS database. Last update on 2017-12-13

Previous  (LUNGMEN 1) (MAANSHAN-1)  Next