AGESTA

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PHWR
Vattenfall AB
AB SVAFO
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
10 MWe
9 MWe
12 MWe
80 MWt
Construction Start Date First Criticality Date
01 Dec, 1957
17 Jul, 1963
First Grid Connection Commercial Operation Date
01 May, 1964
01 May, 1964
Permanent Shutdown Date
02 Jun, 1974

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.40 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 1974

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1964 Data Not Provided
1965 "
1966 "
1967 "
1968 "
1969 "
1970 "
1971 30.000 12 3072 35.1 28.5 NC 28.5 NC
1972 49.000 12 0 0.0 100.0 NC 46.5 NC
1973 43.500 10 6345 72.4 58.6 NC 49.7 NC
1974 18.100 10 3563 97.6 78.3 NC 49.7 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2018-06-23