NINGDE-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
China Guangdong Nuclear Power Group
Fujian Ningde Nuclear Power Company Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1018 MWe
1018 MWe
1080 MWe
2905 MWt
Construction Start Date First Criticality Date
18 Feb, 2008
24 Nov, 2012
First Grid Connection Commercial Operation Date
28 Dec, 2012
15 Apr, 2013

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
6.95 TW.h
99.9 %
99.3 %
0.1 %
96.6 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2012 4.120 1018 81
2013 6947.980 1018 7369 99.3 99.9 99.9 96.6 96.6
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-04-19

Previous  (LING AO-4) (NINGDE-2)  Next