HONGYANHE-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Liaoning Hongyanhe Nuclear Power Co. Ltd. (Lhnpc)
Liaoning Hongyanhe Nuclear Power Co. Ltd. (Lhnpc)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1061 MWe
1061 MWe
1119 MWe
2905 MWt
Construction Start Date First Criticality Date
18 Aug, 2007
16 Jan, 2013
First Grid Connection Commercial Operation Date
17 Feb, 2013
06 Jun, 2013

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
5.68 TW.h
97.6 %
100.0 %
2.4 %
104.7 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2013 5683.380 1119 7632 100.0 97.6 97.6 104.7 104.7
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-10-20