ATUCHA-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
PHWR KWU
Nucleoelectrica Argentina S.A.
Nucleoelectrica Argentina S.A.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
692 MWe
692 MWe
745 MWe
2160 MWt
Construction Start Date First Criticality Date
14 Jul, 1981
03 Jun, 2014
First Grid Connection Commercial Operation Date
27 Jun, 2014
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2014-10-22

Previous  (ATUCHA-1) (CAREM25)  Next