HANBIT-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
WH F
Korea Hydro And Nuclear Power Co.
Korea Hydro And Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
960 MWe
903 MWe
996 MWe
2787 MWt
Construction Start Date First Criticality Date
04 Jun, 1981
31 Jan, 1986
First Grid Connection Commercial Operation Date
05 Mar, 1986
25 Aug, 1986

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
197.95 TW.h
88.0 %
88.5 %
12.0 %
90.2 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1986 2467.920 900 2928 94.5 94.4 94.4 89.1 89.1
1987 5973.920 900 6870 78.4 78.8 82.7 75.8 79.1
1988 6199.620 900 6844 77.9 77.9 80.6 78.4 78.8
1989 6451.790 900 7136 81.5 81.5 80.9 81.8 79.7
1990 6897.480 900 7507 85.7 85.7 82.0 87.5 81.5
1991 6695.620 900 7383 84.3 84.3 82.4 84.9 82.2
1992 6947.350 900 7600 86.5 86.5 83.1 87.9 83.1
1993 6723.950 900 7603 86.8 86.8 83.6 85.3 83.4
1994 8230.120 890 8751 99.9 99.4 85.5 105.6 86.0
1995 6094.640 900 6781 77.4 74.9 84.3 77.3 85.1
1996 6755.470 900 7255 82.6 81.4 84.0 85.4 85.1
1997 8236.060 900 8741 99.8 99.4 85.4 104.5 86.8
1998 7104.490 900 7599 86.8 85.5 85.4 90.1 87.1
1999 6729.980 900 7242 82.7 81.1 85.1 85.4 87.0
2000 7215.090 900 7696 87.6 87.5 85.2 91.3 87.2
2001 8346.440 900 8760 100.0 99.9 86.2 105.9 88.5
2002 7419.030 900 7867 89.8 88.8 86.4 94.1 88.8
2003 7074.390 900 7593 86.7 86.3 86.4 89.7 88.9
2004 7207.190 900 7688 87.5 86.7 86.4 91.2 89.0
2005 8302.850 900 8760 100.0 100.0 87.1 105.3 89.8
2006 7545.070 945 8030 91.7 91.1 87.3 91.1 89.9
2007 6466.510 942 6855 78.2 77.3 86.8 78.4 89.3
2008 8434.700 953 8784 100.0 99.9 87.4 100.8 89.9
2009 7414.030 953 7785 88.9 88.4 87.5 88.8 89.8
2010 7791.080 953 8158 93.1 92.4 87.7 93.3 90.0
2011 8417.700 953 8760 100.0 99.8 88.2 100.8 90.4
2012 7733.460 959 8103 92.2 91.3 88.3 91.8 90.5
2013 6911.440 960 7204 82.2 81.1 88.0 82.2 90.2