Abstract
The High Temperature Engineering Test Reactor (HTTR) which is under construction by Japan Atomic Energy Research Institute (JAERI) is a graphite-moderated and helium gas-cooled reactor with an outlet temperature of 950 deg. C and a thermal output of 30MW. The first criticality is expected at the end of October 1997. The start-up physics tests (SPTs) are planned in the period from mid 1997 to the end of 1998. Characteristic items of the SPTs are: 1) Criticality approach. 2) Tests on a preliminary annual core. 3) Measurement of scram reactivity. 4) Excess reactivity test. 5) Measurements along with a 2-step-scram reactor shutdown procedure.
view the full text of this article (11 pages, format: PDF, size= 594kB)