Abstract
This report covers operations of the Prototype Fast Reactor (PFR) and its associated fuel reprocessing plant at Dounreay up to 31. March 1’994, the final day of operation of the reactor. The period was distinguished by the achievement of the highest annual load factor (56.5% for the year from April 1993 to March 1994) in the reactor’s 20 year history with a load factor of 93% and the most productive continuous turbine run (18160 MWd) as the records for its final run.