Abstract
In the period of searching for the most advantageous type of a nuclear power reactor suited to industrial applications in CMEA countries, CSSR concentrated, owing to the international division of work principles valid at that time, almost exclusively on the HWGCR reactor. In CSSR, a prototype of the reactor in question with a capacity of 150 MW was implemented, the manufacture of this type mastered and the necessary organizational and technical background for managing and ensuring nuclear fuel industrial manufacture relative to the reactor type developed created. Evidently, this development and the modifications in the nuclear power industry orientation affected significantly the aims in the domain of research, development and implementation of the nuclear research work effected.
view the full text of this article (11 pages, format: PDF, size= 646kB)