Conference Article: Permanent cessation of Tokai power plant's operation

Satoh, T. (Japan Atomic Power Co., Tokyo (Japan))

Abstract

Tokai power plant (166MWe, Magnox type: GCR) is the first commercial reactor in Japan and has been kept operating stable since its commissioning in July 1996. During this period it has produced electricity of approximately 27.7 billion KWh (as of March 1997) and its stable operation has contributed greatly to the stable supply of electricity in Japan. Furthermore, technologies in various fields have been developed, demonstrated and accumulated through the construction and operation of Tokai power plant. It also contributes to training for many nuclear engineers, and constructions and operations of nuclear power stations by other Japanese power companies. As a pioneer, it has been achieved to develop and popularize Japanese nuclear power generation. On the other hand, Tokai power plant has small capacity in its electric power output, even though the size of the reactor and heat exchangers are rather bigger than those of LWR due to the characteristics of GCR. Therefore, the generation cost is higher than the LWR. Since there is no plant whose reactor type is the same as that of Tokai power plant, the costs for maintenance and fuel cycle are relatively higher than that of LWR. Finally we concluded that the longer we operate it, the less we can take advantage of it economically. As a result of the evaluation for the future operation of Tokai power plant including the current status for supply of electricity by the Japanese utilities and study of decommissioning by Japanese government, we decided to have a plan of stopping its commercial operation of Tokai power plant in the end of March, 1998, when we completely consume its fuel that we possess. From now on, we set about performing necessary studies and researches on the field of plant characterization, remote-cutting, waste disposal for carrying out the decommissioning of Tokai power plant safely and economically. We are going to prepare the decommissioning planning for Tokai power plant in a few years based on the guideline recommended by the government and on the situation of establishment of relevant criteria under the consultation and coordination with the government, local communities, utilities and relevant organizations.

view the full text of this article (15 pages, format: PDF, size= 1044kB)


key words: Gas Cooled Reactor, Nuclear Technology
Reference:
Technical committee meeting on technologies for gas cooled reactor decommissioning, fuel storage and waste disposal. Juelich (Germany) 8-10 Sep 1997
International Atomic Energy Agency, Vienna (Austria)
IAEA-TECDOC--1043, pp:55-69