Fast Reactors and Accelerator Driven Systems Knowledge Base
Conference Article: Overall strategy of Creys Malville power station dismantling
Alfonse, P. (EDF/CIDEN, Creys Malville (France))Abstract
The power station was stopped by a government decision following the elections in 1997. This shutdown was then officialized by a letter dated April 1998 and the decree of December 1998. This was a non-technical shutdown and as such had not been envisaged. There has been no early warning. (author)
view the full text of this article (2 pages, format: PDF, size= 122kB)
key words: control elements; fuel elements; government policies; planning; reactor components; reactor decommissioning; reactor dismantling; reactor shutdown; safety reports; super phenix reactor; breeder reactors; enriched uranium reactors; epithermal reactors; fast reactors; fbr type reactors; liquid metal cooled reactors; lmfbr type reactors; plutonium reactors; reactor components; reactors; sodium cooled reactors
- Reference:
- Proceedings of a Technical Meeting held in Cadarache, France 11-15 March 2002
- International Atomic Energy Agency, Vienna (Austria)
- IAEA-TECDOC--1405, pp:185-186
- International Atomic Energy Agency, Vienna (Austria)
