Engineering Safety Review Services (ESRS) related to site and external hazards


Country Site/Plant Service

Armenia Medzamor
WWER-440/230
(1) Review of tectonic stability and volcanic hazard.
(2) Review of design basis seismic parameters.
Bulgaria Belene WWER-1000
Kozloduy, Unit 5
WWER-1000
(1) Review of design basis seismic parameters.
(2) Review of seismic PSA.
Czech Republic Central interim spent
fuel storage facility
(1) Review of site survey results.
(2) Review of geological characteristics of the Skalka site.
Hungary Paks
WWER-440/213
(1) Review of automatic seismic trip system.
(2) Review of tectonic stability.
(3) Review of design basis seismic parameters.
(4) Follow-up review of desgin basis seismic parameters.
Indonesia Muria (1) Review of site safety.
(2) Review of tectonic stability and volcanic hazard.
(3) Follow-up review of tectonic stability and volcanic hazard.
Iran, Islamic Rep. of Bushehr WWER Review of tectonic stability and design basis seismic parameters.
Kazakhstan Alatau research reactor,
WWR 10 MW
Review of tectonic stability and seismic capacity.
Korea, Rep. of Generic Regional workshop on seismic hazard methodology.
Morocco Sidi Boulbra Review of design basis seismic parameters.
Pakistan Chashma PWR 300 MW
(Chinese design)
(1) Review of seismic design.
(2) Follow-up review of seismic design (in Shanghai).
Russian Federation WWER generic Workshop on seismic assessment and upgrading of
WWER type nuclear power plants.
Slovakia Mochovce
WWER-440/213
Preparation of terms of reference for seismic assessment
and upgrading.
Thailand Not yet defined Review (with two follow-up missions) of terms of reference for
site survey and evaluation.
Uzbekistan Ulughbek research
reactor WWR 10 MW
Review of tectonic stability and seismic capacity.