SHIDAO BAY-1

Under Construction


Reactor Details

Reactor Type Model Owner Operator
HTGR
HTR-PM
China Huaneng Group
Huaneng Shandong Shidao Bay Nuclear Power Company,Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
200 MWe
200 MWe
211 MWe
500 MWt
Construction Start Date First Criticality Date
09 Dec, 2012
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data are from the PRIS database. Last update on 2014-10-21

Previous  (SANMEN-2) (TAISHAN-1)  Next