TAISHAN 2

(Under Construction)


Reactor Details

Reactor Type Model Owner Operator
PWR
EPR-1750
Guangdong Taishan Nuclear Power Joint Venture Company Limited (Tnpc) Joint Venture Between Edf (30%) And Guangdong Nuclear Power Group (Cgnpc).
Guangdong Taishan Nuclear Power Joint Venture Company Limited (Tnpc) Joint Venture Between Edf (30%) And Guangdong Nuclear Power Group (Cgnpc).
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1660 MWe
1660 MWe
1750 MWe
4590 MWt
Construction Start Date First Criticality Date First Grid Connection Commercial Operation Date
15 Apr, 2010
N/A
N/A
N/A


Above data are from the PRIS database. Last update on 2013-05-22