FUQING-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
China National Nuclear Corporation
Cnnc Fujian Fuqing Nuclear Power Co.,Ltd
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1000 MWe
1080 MWe
2905 MWt
Construction Start Date First Criticality Date
21 Nov, 2008
24 Jul, 2014
First Grid Connection Commercial Operation Date
20 Aug, 2014
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2014-10-25