HONGYANHE-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Liaoning Hongyanhe Nuclear Power Co. Ltd. (Lhnpc)
Liaoning Hongyanhe Nuclear Power Co. Ltd. (Lhnpc)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1061 MWe
1061 MWe
1119 MWe
2905 MWt
Construction Start Date First Criticality Date
28 Mar, 2008
24 Oct, 2013
First Grid Connection Commercial Operation Date
23 Nov, 2013
13 May, 2014

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.10 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2013 82.000 1061 340
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2014-07-28

Previous  (HONGYANHE-1) (HONGYANHE-3)  Next