SHIN-ULCHIN-1

(Under Construction)


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Korea Hydro And Nuclear Power Co.
Korea Hydro And Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1340 MWe
1340 MWe
1400 MWe
3938 MWt
Construction Start Date First Criticality Date First Grid Connection Commercial Operation Date
10 Jul, 2012
N/A
N/A
N/A


Above data are from the PRIS database. Last update on 2013-05-18

Previous  (SHIN-KORI-4) (SHIN-WOLSONG-1)  Next