YANGJIANG-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Guandong Nuclear Power Joint Venture Company Limited
Yangjiang Nuclear Power Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1000 MWe
1021 MWe
1086 MWe
2905 MWt
Construction Start Date First Criticality Date
16 Dec, 2008
23 Dec, 2013
First Grid Connection Commercial Operation Date
31 Dec, 2013
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.00 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2013 0.000 1000 5
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2014-10-20

Previous  (TIANWAN-4) (YANGJIANG-2)  Next