LING AO-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Lingdong Nuclear Power Company Ltd.
Daya Bay Nuclear Power Operations And Management Co,Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1007 MWe
1007 MWe
1080 MWe
2905 MWt
Construction Start Date First Criticality Date
15 Dec, 2005
09 Jun, 2010
First Grid Connection Commercial Operation Date
15 Jul, 2010
15 Sep, 2010

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
23.61 TW.h
82.5 %
84.3 %
17.5 %
80.8 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2010 2164.440 1007 2642 64.3 77.6 77.6 62.0 62.0
2011 6333.190 1007 6866 78.4 71.3 73.2 71.8 70.7
2012 7720.900 1020 7877 89.7 88.0 79.4 86.8 76.9
2013 7942.050 1007 8017 91.5 89.6 82.5 90.0 80.8
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-08-31