Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
LING AO 3
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
CPR-1000
Lingdong Nuclear Power Company Ltd.
Daya Bay Nuclear Power Operations And Management Co,Ltd.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1020
MW
e
1000
MW
e
1080
MW
e
2905
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
15 Dec, 2005
09 Jun, 2010
15 Jul, 2010
20 Sep, 2010
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
15.66 TW.h
79.4 %
81.2 %
20.6 %
76.9 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2010
2164.440
1007
2642
64.3
77.6
77.6
62.0
62.0
2011
6333.190
1007
6866
78.4
71.3
72.9
71.8
69.3
2012
7720.900
1020
7877
89.7
88.0
79.4
86.8
76.9
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-05-21
Previous
(LING AO 2)
(LING AO 4)
Next
CHINA
CEFR
CHANGJIANG 1
CHANGJIANG 2
DAYA BAY 1
DAYA BAY 2
FANGCHENGGANG 1
FANGCHENGGANG 2
FANGJIASHAN 1
FANGJIASHAN 2
FUQING 1
FUQING 2
FUQING 3
FUQING 4
HAIYANG 1
HAIYANG 2
HONGYANHE 1
HONGYANHE 2
HONGYANHE 3
HONGYANHE 4
LING AO 1
LING AO 2
LING AO 3
LING AO 4
NINGDE 1
NINGDE 2
NINGDE 3
NINGDE 4
QINSHAN 1
QINSHAN 2-1
QINSHAN 2-2
QINSHAN 2-3
QINSHAN 2-4
QINSHAN 3-1
QINSHAN 3-2
SANMEN 1
SANMEN 2
SHIDAO BAY 1
TAISHAN 1
TAISHAN 2
TIANWAN 1
TIANWAN 2
TIANWAN 3
YANGJIANG 1
YANGJIANG 2
YANGJIANG 3
YANGJIANG 4