LING AO-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CPR-1000
Lingdong Nuclear Power Company Ltd.
Daya Bay Nuclear Power Operations And Management Co,Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1007 MWe
1007 MWe
1080 MWe
2905 MWt
Construction Start Date First Criticality Date
15 Jun, 2006
25 Feb, 2011
First Grid Connection Commercial Operation Date
03 May, 2011
07 Aug, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
18.41 TW.h
86.9 %
88.2 %
13.1 %
85.8 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 3914.720 1007 5268 100.0 99.6 99.6 96.0 96.0
2012 7009.720 1020 7156 81.5 80.1 85.8 78.2 83.4
2013 7870.250 1007 7880 90.0 88.4 86.9 89.2 85.8
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-10-20