TIANWAN-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-428
Jiangsu Nuclear Power Corporation
Jiangsu Nuclear Power Corporation
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
990 MWe
990 MWe
1060 MWe
3000 MWt
Construction Start Date First Criticality Date
20 Sep, 2000
01 May, 2007
First Grid Connection Commercial Operation Date
14 May, 2007
16 Aug, 2007

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
47.98 TW.h
85.6 %
85.8 %
14.4 %
87.9 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2007 3974.000 933 4471 100.0 100.0 100.0 105.1 105.1
2008 7003.030 933 7193 81.9 81.2 85.9 85.4 90.4
2009 6943.400 933 7054 80.5 80.7 83.7 85.0 88.0
2010 7131.130 933 7260 82.9 82.3 83.2 87.2 87.8
2011 7546.200 990 7658 87.4 87.0 84.2 87.0 87.6
2012 7640.120 990 7722 87.9 87.8 84.9 87.9 87.7
2013 7741.450 990 7837 89.5 89.1 85.6 89.3 87.9
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-11-24