Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
TIANWAN 2
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-428
Jiangsu Nuclear Power Corporation
Jiangsu Nuclear Power Corporation
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
990
MW
e
990
MW
e
1060
MW
e
3000
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
20 Sep, 2000
01 May, 2007
14 May, 2007
16 Aug, 2007
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
40.24 TW.h
84.9 %
85.1 %
15.1 %
87.7 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2007
3974.000
933
4471
100.0
100.0
100.0
105.1
105.1
2008
7003.030
933
7193
81.9
81.2
85.9
85.4
90.4
2009
6943.400
933
7054
80.5
80.7
83.7
85.0
88.0
2010
7131.130
933
7260
82.9
82.3
83.2
87.2
87.8
2011
7546.200
990
7658
87.4
87.0
84.2
87.0
87.6
2012
7640.120
990
7722
87.9
87.8
84.9
87.9
87.7
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-05-21
Previous
(TIANWAN 1)
(TIANWAN 3)
Next
CHINA
CEFR
CHANGJIANG 1
CHANGJIANG 2
DAYA BAY 1
DAYA BAY 2
FANGCHENGGANG 1
FANGCHENGGANG 2
FANGJIASHAN 1
FANGJIASHAN 2
FUQING 1
FUQING 2
FUQING 3
FUQING 4
HAIYANG 1
HAIYANG 2
HONGYANHE 1
HONGYANHE 2
HONGYANHE 3
HONGYANHE 4
LING AO 1
LING AO 2
LING AO 3
LING AO 4
NINGDE 1
NINGDE 2
NINGDE 3
NINGDE 4
QINSHAN 1
QINSHAN 2-1
QINSHAN 2-2
QINSHAN 2-3
QINSHAN 2-4
QINSHAN 3-1
QINSHAN 3-2
SANMEN 1
SANMEN 2
SHIDAO BAY 1
TAISHAN 1
TAISHAN 2
TIANWAN 1
TIANWAN 2
TIANWAN 3
YANGJIANG 1
YANGJIANG 2
YANGJIANG 3
YANGJIANG 4