TIANWAN 1
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-428
Jiangsu Nuclear Power Corporation
Jiangsu Nuclear Power Corporation
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
990
MW
e
990
MW
e
1060
MW
e
3000
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
20 Oct, 1999
20 Dec, 2005
12 May, 2006
17 May, 2007
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
41.56 TW.h
81.4 %
81.6 %
18.6 %
83.7 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2006
1235.000
1000
2790
2007
5311.000
933
5688
82.7
82.4
82.4
84.8
84.8
2008
6116.160
933
6270
71.4
71.0
75.2
74.6
78.4
2009
6337.710
933
6553
74.8
74.1
74.8
77.5
78.0
2010
7539.590
933
7643
87.2
87.0
78.2
92.2
82.0
2011
7470.080
990
7606
86.8
86.6
80.1
86.1
83.0
2012
7550.160
990
7635
86.9
86.8
81.4
86.8
83.7
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-05-20
Previous
(TAISHAN 2)
(TIANWAN 2)
Next
CHINA
CEFR
CHANGJIANG 1
CHANGJIANG 2
DAYA BAY 1
DAYA BAY 2
FANGCHENGGANG 1
FANGCHENGGANG 2
FANGJIASHAN 1
FANGJIASHAN 2
FUQING 1
FUQING 2
FUQING 3
FUQING 4
HAIYANG 1
HAIYANG 2
HONGYANHE 1
HONGYANHE 2
HONGYANHE 3
HONGYANHE 4
LING AO 1
LING AO 2
LING AO 3
LING AO 4
NINGDE 1
NINGDE 2
NINGDE 3
NINGDE 4
QINSHAN 1
QINSHAN 2-1
QINSHAN 2-2
QINSHAN 2-3
QINSHAN 2-4
QINSHAN 3-1
QINSHAN 3-2
SANMEN 1
SANMEN 2
SHIDAO BAY 1
TAISHAN 1
TAISHAN 2
TIANWAN 1
TIANWAN 2
TIANWAN 3
YANGJIANG 1
YANGJIANG 2
YANGJIANG 3
YANGJIANG 4