COMANCHE PEAK-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
W (4-loop) DRYAMB
Luminant Generation Company Llc
Luminant Generation Company Llc
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1209 MWe
1150 MWe
1259 MWe
3612 MWt
Construction Start Date First Criticality Date
19 Dec, 1974
03 Apr, 1990
First Grid Connection Commercial Operation Date
24 Apr, 1990
13 Aug, 1990

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
207.05 TW.h
89.9 %
89.8 %
10.1 %
86.6 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1990 3335.180 1137 4399 78.0 80.6 80.6 60.2 60.2
1991 5360.520 1150 5341 61.0 60.5 66.4 53.2 55.3
1992 6937.480 1150 6947 79.1 79.1 71.7 68.7 60.8
1993 7150.440 1150 6932 79.1 79.1 73.9 71.0 63.8
1994 9367.600 1150 8653 98.8 98.8 79.5 93.0 70.4
1995 7803.750 1150 7444 85.0 85.0 80.5 77.5 71.7
1996 7756.240 1150 7265 82.7 82.7 80.9 76.8 72.5
1997 9478.880 1150 8656 98.8 98.8 83.3 94.1 75.4
1998 8505.960 1150 7848 89.6 89.6 84.0 84.4 76.5
1999 8601.510 1150 7922 90.4 90.4 84.7 85.4 77.4
2000 9619.800 1150 8784 100.0 100.0 86.2 95.2 79.1
2001 8444.320 1150 7781 88.8 88.9 86.4 83.8 79.6
2002 7785.260 1150 7213 82.3 83.0 86.1 77.3 79.4
2003 9625.950 1150 8653 98.8 98.8 87.1 95.6 80.6
2004 9018.130 1150 7877 89.7 89.8 87.3 89.3 81.2
2005 9217.830 1084 8004 91.4 91.4 87.5 97.1 82.2
2006 10297.950 1150 8760 100.0 100.0 88.3 102.2 83.4
2007 8596.750 1150 7437 84.9 84.9 88.1 85.3 83.5
2008 9658.710 1209 8262 94.1 94.1 88.4 94.8 84.1
2009 10640.870 1209 8760 100.0 100.0 89.0 100.5 85.0
2010 9676.720 1209 8074 92.2 92.2 89.2 91.4 85.3
2011 9667.760 1209 8056 92.0 92.0 89.4 91.3 85.6
2012 10438.080 1209 8537 97.2 97.2 89.7 98.3 86.2
2013 10028.690 1205 8211 93.7 93.7 89.9 95.0 86.6
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-10-22