Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
SHEARON HARRIS-1
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
W (3-loop) DRYAMB
Progress Energy Carolinas, Inc.
Progress Energy
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
928
MW
e
900
MW
e
960
MW
e
2900
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
28 Jan, 1978
03 Jan, 1987
19 Jan, 1987
02 May, 1987
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
169.43 TW.h
88.5 %
88.4 %
11.5 %
88.0 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1987
Data Not Provided
1988
5345.560
860
6458
73.5
73.6
73.6
70.8
70.8
1989
5638.850
860
6873
78.5
78.5
76.0
74.8
72.8
1990
6339.000
860
7812
89.2
89.2
80.4
84.1
76.6
1991
5927.440
860
7080
80.8
80.8
80.5
78.7
77.1
1992
5427.880
860
6501
74.0
74.0
79.2
71.8
76.0
1993
7527.730
860
8721
99.6
99.6
82.6
99.9
80.0
1994
6065.060
860
7195
82.1
82.2
82.5
80.5
80.1
1995
5966.340
860
7279
83.1
83.1
82.6
79.2
80.0
1996
7067.740
860
8301
94.5
94.6
83.9
93.6
81.5
1997
5909.030
860
6934
79.2
79.2
83.5
78.4
81.2
1998
6711.570
860
7891
90.1
90.1
84.1
89.1
81.9
1999
7244.150
860
8484
96.8
96.9
85.1
96.2
83.1
2000
6877.960
860
8098
92.2
92.2
85.7
91.0
83.7
2001
5401.460
860
6335
72.3
72.3
84.7
71.7
82.8
2002
7835.040
900
8643
98.7
98.7
85.7
99.4
84.0
2003
7236.920
900
8082
92.3
92.3
86.1
91.8
84.5
2004
7008.430
900
7687
87.5
87.5
86.2
88.6
84.8
2005
7930.830
900
8710
99.4
99.4
87.0
100.6
85.7
2006
7029.270
900
7749
88.5
88.5
87.0
89.2
85.9
2007
7403.050
900
8176
93.3
93.4
87.4
93.9
86.3
2008
7821.410
900
8534
97.2
97.2
87.9
98.9
86.9
2009
7403.160
900
8091
92.4
92.4
88.1
93.9
87.2
2010
7080.620
900
7746
88.4
88.4
88.1
89.8
87.3
2011
8111.770
900
8760
100.0
100.0
88.6
102.9
88.0
2012
7121.940
928
7612
86.7
86.9
88.5
88.7
88.0
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-05-24
Previous
(SEQUOYAH-2)
(SHIPPINGPORT)
Next
UNITED STATES OF AMERICA
ARKANSAS ONE-1
ARKANSAS ONE-2
BEAVER VALLEY-1
BEAVER VALLEY-2
BIG ROCK POINT
BONUS
BRAIDWOOD-1
BRAIDWOOD-2
BROWNS FERRY-1
BROWNS FERRY-2
BROWNS FERRY-3
BRUNSWICK-1
BRUNSWICK-2
BYRON-1
BYRON-2
CALLAWAY-1
CALVERT CLIFFS-1
CALVERT CLIFFS-2
CATAWBA-1
CATAWBA-2
CLINTON-1
COLUMBIA
COMANCHE PEAK-1
COMANCHE PEAK-2
COOPER
CRYSTAL RIVER-3
CVTR
DAVIS BESSE-1
DIABLO CANYON-1
DIABLO CANYON-2
DONALD COOK-1
DONALD COOK-2
DRESDEN-1
DRESDEN-2
DRESDEN-3
DUANE ARNOLD-1
ELK RIVER
FARLEY-1
FARLEY-2
FERMI-1
FERMI-2
FITZPATRICK
FORT CALHOUN-1
FORT ST. VRAIN
GE VALLECITOS
GRAND GULF-1
H.B. ROBINSON-2
HADDAM NECK
HALLAM
HATCH-1
HATCH-2
HOPE CREEK-1
HUMBOLDT BAY
INDIAN POINT-1
INDIAN POINT-2
INDIAN POINT-3
KEWAUNEE
LACROSSE
LASALLE-1
LASALLE-2
LIMERICK-1
LIMERICK-2
MAINE YANKEE
MCGUIRE-1
MCGUIRE-2
MILLSTONE-1
MILLSTONE-2
MILLSTONE-3
MONTICELLO
NINE MILE POINT-1
NINE MILE POINT-2
NORTH ANNA-1
NORTH ANNA-2
OCONEE-1
OCONEE-2
OCONEE-3
OYSTER CREEK
PALISADES
PALO VERDE-1
PALO VERDE-2
PALO VERDE-3
PATHFINDER
PEACH BOTTOM-1
PEACH BOTTOM-2
PEACH BOTTOM-3
PERRY-1
PILGRIM-1
PIQUA
POINT BEACH-1
POINT BEACH-2
PRAIRIE ISLAND-1
PRAIRIE ISLAND-2
QUAD CITIES-1
QUAD CITIES-2
R.E. GINNA
RANCHO SECO-1
RIVER BEND-1
SALEM-1
SALEM-2
SAN ONOFRE-1
SAN ONOFRE-2
SAN ONOFRE-3
SAXTON
SEABROOK-1
SEQUOYAH-1
SEQUOYAH-2
SHEARON HARRIS-1
SHIPPINGPORT
SHOREHAM
SOUTH TEXAS-1
SOUTH TEXAS-2
ST. LUCIE-1
ST. LUCIE-2
SURRY-1
SURRY-2
SUSQUEHANNA-1
SUSQUEHANNA-2
THREE MILE ISLAND-1
THREE MILE ISLAND-2
TROJAN
TURKEY POINT-3
TURKEY POINT-4
VERMONT YANKEE
VIRGIL C. SUMMER-1
VIRGIL C. SUMMER-2
VOGTLE-1
VOGTLE-2
VOGTLE-3
WATERFORD-3
WATTS BAR-1
WATTS BAR-2
WOLF CREEK
YANKEE NPS
ZION-1
ZION-2