QINSHAN 2-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
Nuclear Power Plant Qinshan Joint Venture Company Ltd.
Nuclear Power Plant Qinshan Joint Venture Company Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
610 MWe
610 MWe
650 MWe
1930 MWt
Construction Start Date First Criticality Date
01 Apr, 1997
25 Feb, 2004
First Grid Connection Commercial Operation Date
11 Mar, 2004
03 May, 2004

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
46.15 TW.h
87.2 %
87.9 %
12.8 %
88.8 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2004 3764.390 610 6381 96.6 96.2 96.2 98.0 98.0
2005 4521.510 610 7331 83.7 82.7 88.1 84.6 90.0
2006 4790.440 610 7822 89.3 88.8 88.4 89.6 89.8
2007 4817.010 610 7792 89.0 88.3 88.4 90.2 89.9
2008 4635.510 610 7545 85.9 84.9 87.6 86.5 89.2
2009 4787.800 610 7821 89.3 88.2 87.7 89.6 89.3
2010 4715.040 610 7645 87.3 86.6 87.6 88.2 89.1
2011 4960.230 610 8014 91.5 90.9 88.0 92.8 89.6
2012 4335.540 610 7072 80.5 79.6 87.0 80.9 88.6
2013 4818.510 610 7826 89.3 88.7 87.2 90.2 88.8
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-07-22

Previous  (QINSHAN 2-1) (QINSHAN 2-3)  Next