QINSHAN 2-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-600
Nuclear Power Plant Qinshan Joint Venture Company Ltd.
Nuclear Power Plant Qinshan Joint Venture Company Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
610 MWe
610 MWe
650 MWe
1930 MWt
Construction Start Date First Criticality Date
02 Jun, 1996
15 Nov, 2001
First Grid Connection Commercial Operation Date
06 Feb, 2002
15 Apr, 2002

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
50.78 TW.h
79.7 %
79.5 %
20.3 %
80.3 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2002 2965.290 610 4631 73.7 80.4 80.4 75.4 75.4
2003 4327.300 610 7123 81.3 80.9 80.7 81.0 78.8
2004 4395.680 610 7117 81.0 80.1 80.5 82.0 80.0
2005 4944.770 610 7982 91.1 90.6 83.2 92.5 83.4
2006 2938.160 610 4890 55.8 55.2 77.2 55.0 77.3
2007 3503.000 610 5681 64.8 64.1 74.9 65.6 75.2
2008 4677.610 610 7554 86.0 85.2 76.5 87.3 77.1
2009 4500.990 610 7256 82.8 82.7 77.3 84.2 78.0
2010 4985.390 610 8095 92.4 91.7 79.0 93.3 79.8
2011 4029.390 610 6521 74.4 73.7 78.5 75.4 79.1
2012 4545.920 610 7543 85.9 85.2 79.1 84.8 79.7
2013 4680.900 610 7561 86.3 85.8 79.7 87.6 80.3
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-04-20