ROSTOV-2
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-320I
Joint Stock Company "Concern Rosenergoatom"
Joint Stock Company "Concern Rosenergoatom"
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
950
MW
e
950
MW
e
1000
MW
e
3200
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
01 May, 1983
22 Jan, 2010
18 Mar, 2010
10 Dec, 2010
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
19.10 TW.h
89.0 %
90.1 %
11.0 %
89.2 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2010
4303.760
950
6133
100.0
100.0
100.0
97.9
97.9
2011
7368.430
950
7944
90.7
89.4
90.2
88.6
89.3
2012
7433.180
950
7781
88.6
87.6
89.0
89.1
89.2
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-05-20
Previous
(ROSTOV-1)
(ROSTOV-3)
Next
RUSSIA
AKADEMIK LOMONOSOV 1
AKADEMIK LOMONOSOV 2
APS-1 OBNINSK
BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BALTIC-1
BELOYARSK-1
BELOYARSK-2
BELOYARSK-3
BELOYARSK-4
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2
KOLA-3
KOLA-4
KURSK-1
KURSK-2
KURSK-3
KURSK-4
KURSK-5
LENINGRAD 2-1
LENINGRAD 2-2
LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
NOVOVORONEZH-1
NOVOVORONEZH-2
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
ROSTOV-3
ROSTOV-4
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3