ROSTOV-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320I
Joint Stock Company "Concern Rosenergoatom"
Joint Stock Company "Concern Rosenergoatom"
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3200 MWt
Construction Start Date First Criticality Date
01 Sep, 1981
23 Feb, 2001
First Grid Connection Commercial Operation Date
30 Mar, 2001
25 Dec, 2001

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
94.21 TW.h
87.4 %
88.0 %
12.6 %
90.3 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2001 Data from a trial operation not provided
2002 7176.180 950 7543 86.1 84.1 84.1 86.2 86.2
2003 6973.930 950 7154 81.7 81.3 82.7 83.8 85.0
2004 7439.310 950 7766 88.4 87.8 84.4 89.2 86.4
2005 7232.860 950 7628 87.1 85.8 84.8 86.9 86.5
2006 7216.420 950 7386 84.3 83.8 84.6 86.7 86.6
2007 7309.440 950 7536 86.0 85.3 84.7 87.8 86.8
2008 7745.730 950 7799 88.8 88.5 85.2 92.8 87.6
2009 7927.020 950 7916 90.4 90.3 85.9 95.2 88.6
2010 7398.470 950 7828 89.4 88.6 86.2 88.9 88.6
2011 7695.350 950 7736 88.3 88.2 86.4 92.5 89.0
2012 7569.030 950 7614 86.7 86.4 86.4 90.7 89.2
2013 8557.120 950 8618 98.4 98.2 87.4 102.8 90.3
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-04-23