Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
KALININ-4
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-320
Joint Stock Company "Concern Rosenergoatom"
Joint Stock Company "Concern Rosenergoatom"
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
950
MW
e
950
MW
e
1000
MW
e
3200
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
01 Aug, 1986
08 Nov, 2011
24 Nov, 2011
25 Dec, 2012
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
5.30 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2011
131.220
950
433
2012
5166.490
950
6858
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data are from the PRIS database. Last update on 2013-06-19
Previous
(KALININ-3)
(KOLA-1)
Next
RUSSIA
AKADEMIK LOMONOSOV 1
AKADEMIK LOMONOSOV 2
APS-1 OBNINSK
BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BALTIC-1
BELOYARSK-1
BELOYARSK-2
BELOYARSK-3
BELOYARSK-4
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2
KOLA-3
KOLA-4
KURSK-1
KURSK-2
KURSK-3
KURSK-4
KURSK-5
LENINGRAD 2-1
LENINGRAD 2-2
LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
NOVOVORONEZH-1
NOVOVORONEZH-2
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
ROSTOV-3
ROSTOV-4
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3