ULCHIN-5
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
OPR-1000
Korea Hydro And Nuclear Power Co.
Korea Hydro And Nuclear Power Co.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
998
MW
e
1050
MW
e
1048
MW
e
2815
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
01 Oct, 1999
28 Nov, 2003
18 Dec, 2003
29 Jul, 2004
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
69.61 TW.h
93.0 %
93.4 %
7.0 %
93.6 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2003
18.430
1001
188
2004
4415.650
960
4963
97.9
97.9
97.9
101.4
101.4
2005
7321.600
960
7409
84.6
83.8
88.0
87.1
91.3
2006
7882.810
994
7925
90.5
90.6
89.1
90.5
91.0
2007
8025.930
995
8115
92.6
91.9
89.9
92.1
91.3
2008
8763.820
1001
8784
100.0
99.9
92.2
99.7
93.2
2009
7924.160
1001
7988
91.2
90.8
91.9
90.4
92.7
2010
8160.250
997
8245
94.1
93.2
92.1
93.4
92.8
2011
8052.720
997
8106
92.5
92.0
92.1
92.2
92.7
2012
8773.910
998
8784
100.0
99.9
93.0
100.1
93.6
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-05-23
Previous
(ULCHIN-4)
(ULCHIN-6)
Next
KOREA, REPUBLIC OF
KORI-1
KORI-2
KORI-3
KORI-4
SHIN-KORI-1
SHIN-KORI-2
SHIN-KORI-3
SHIN-KORI-4
SHIN-ULCHIN-1
SHIN-WOLSONG-1
SHIN-WOLSONG-2
ULCHIN-1
ULCHIN-2
ULCHIN-3
ULCHIN-4
ULCHIN-5
ULCHIN-6
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4
YONGGWANG-1
YONGGWANG-2
YONGGWANG-3
YONGGWANG-4
YONGGWANG-5
YONGGWANG-6