DOUGLAS POINT
(Permanent Shutdown)
Reactor Details
|
Reactor Type
|
Model
|
Owner
|
Operator
|
PHWR
|
CANDU 200
|
Atomic Energy Of Canada Ltd.
|
Ontario Hydro
|
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
206
MWe
|
203
MWe
|
218
MWe
|
704
MWt
|
|
Construction Start Date
|
First Criticality Date
|
First Grid Connection
|
Commercial Operation Date
|
01 Feb, 1960
|
15 Nov, 1966
|
07 Jan, 1967
|
26 Sep, 1968
|
|
|
|
Permanent Shutdown Date
|
|
|
04 May, 1984
|
LifeTime Performance
|
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
15.63 TW.h
|
59.5 %
|
67.1 %
|
40.5 %
|
55.6 %
|
Lifetime performance calculated up to year
1984
Operating History
|
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
|
1967
|
Data from a trial operation not provided
|
|
1968
|
Data Not Provided
|
|
1969
|
"
|
|
1970
|
916.000
|
220
|
5155
|
59.0
|
47.7
|
NC
|
47.7
|
NC
|
|
1971
|
1044.500
|
220
|
5345
|
61.2
|
54.3
|
51.0
|
54.4
|
51.0
|
|
1972
|
356.500
|
220
|
1796
|
20.5
|
20.8
|
40.9
|
18.5
|
40.2
|
|
1973
|
1048.100
|
208
|
5672
|
63.7
|
62.9
|
46.2
|
56.6
|
44.1
|
|
1974
|
1129.600
|
207
|
6992
|
80.0
|
62.5
|
49.4
|
62.5
|
47.7
|
|
1975
|
1284.300
|
206
|
6702
|
76.7
|
71.4
|
52.9
|
71.4
|
51.5
|
|
1976
|
1089.500
|
206
|
5543
|
63.3
|
60.7
|
54.0
|
60.4
|
52.7
|
|
1977
|
772.000
|
206
|
5713
|
65.4
|
45.9
|
53.0
|
42.9
|
51.5
|
|
1978
|
855.200
|
206
|
6712
|
76.8
|
49.2
|
52.6
|
47.5
|
51.1
|
|
1979
|
1063.900
|
206
|
8161
|
92.2
|
66.8
|
54.0
|
58.3
|
51.8
|
|
1980
|
310.500
|
130
|
2436
|
27.7
|
27.1
|
52.4
|
27.2
|
50.4
|
|
1981
|
1109.400
|
206
|
7981
|
91.1
|
94.1
|
55.9
|
61.5
|
51.3
|
|
1982
|
1343.000
|
206
|
6703
|
76.5
|
74.7
|
57.4
|
74.4
|
53.1
|
|
1983
|
1401.200
|
206
|
6860
|
78.3
|
77.7
|
58.9
|
77.6
|
54.9
|
|
1984
|
538.970
|
206
|
2664
|
88.6
|
87.1
|
59.5
|
86.9
|
55.6
|
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data are from the PRIS database. Last update on 2013-05-17