HANUL-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
France CPI
Korea Hydro And Nuclear Power Co.
Korea Hydro And Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
962 MWe
903 MWe
1008 MWe
2775 MWt
Construction Start Date First Criticality Date
05 Jul, 1983
25 Feb, 1989
First Grid Connection Commercial Operation Date
14 Apr, 1989
30 Sep, 1989

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
175.72 TW.h
87.8 %
88.7 %
12.2 %
88.9 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1989 Data Not Provided
1990 5547.290 920 6395 73.0 73.0 73.0 68.8 68.8
1991 6671.160 920 7603 86.8 86.8 79.9 82.8 75.8
1992 7076.880 920 7686 87.5 87.5 82.4 87.6 79.7
1993 7230.220 920 7693 87.8 87.8 83.8 89.7 82.2
1994 6889.670 890 7315 83.5 81.5 83.3 88.4 83.4
1995 7810.260 920 8223 93.9 93.4 85.0 96.9 85.7
1996 7696.380 920 8151 92.8 91.0 85.9 95.2 87.1
1997 7055.180 920 7534 86.0 84.3 85.7 87.5 87.1
1998 7388.870 920 7947 90.7 88.3 86.0 91.7 87.6
1999 7815.170 920 8748 99.9 94.5 86.8 97.0 88.6
2000 6836.810 920 7330 83.4 82.3 86.4 84.6 88.2
2001 7268.560 920 7848 89.6 89.2 86.6 90.2 88.4
2002 6485.830 920 6939 79.2 78.3 86.0 80.5 87.8
2003 7253.750 920 7686 87.7 87.1 86.1 90.0 87.9
2004 7253.740 920 7888 89.8 88.6 86.3 89.8 88.0
2005 6582.350 920 7218 82.4 80.7 85.9 81.7 87.6
2006 7882.510 937 8510 97.2 96.7 86.6 96.0 88.2
2007 7391.650 937 7946 90.7 90.0 86.8 90.0 88.2
2008 7264.190 942 7752 88.2 87.9 86.8 87.8 88.2
2009 8258.310 942 8760 100.0 100.0 87.5 100.1 88.8
2010 7506.860 942 7991 91.2 90.8 87.6 91.0 88.9
2011 6571.070 942 7003 79.9 79.3 87.3 79.6 88.5
2012 8325.470 961 8661 98.6 98.3 87.8 98.6 89.0
2013 7446.490 962 7740 88.4 88.0 87.8 88.4 88.9
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-11-22

Previous  (HANUL-1) (HANUL-3)  Next