MONJU

Long-term Shutdown


Reactor Details

Reactor Type Model Owner Operator
FBR
-
Japan Atomic Energy Agency
Japan Atomic Energy Agency
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
246 MWe
246 MWe
280 MWe
714 MWt
Construction Start Date First Criticality Date
10 May, 1986
05 Apr, 1994
First Grid Connection Commercial Operation Date Long-Term Shutdown Date
29 Aug, 1995
N/A
08 Dec, 1995

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2010

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1995 Data Not Available - Long-Term ShutdownData from a trial operation not provided
1996 "
1997 "
1998 "
1999 "
2000 "
2001 "
2002 "
2003 "
2004 "
2005 "
2006 "
2007 "
2008 "
2009 "
2010 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2014-10-30

Previous  (MIHAMA-3) (OHI-1)  Next