RAJASTHAN-6

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
Horizontal Pressure Tube type
Nuclear Power Corporation Of India Ltd.
Nuclear Power Corporation Of India Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
202 MWe
202 MWe
220 MWe
801 MWt
Construction Start Date First Criticality Date
20 Jan, 2003
23 Jan, 2010
First Grid Connection Commercial Operation Date
28 Mar, 2010
31 Mar, 2010

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
5.31 TW.h
78.4 %
79.9 %
21.6 %
79.9 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2010 494.850 202 3041 46.1 38.1 38.1 37.1 37.1
2011 1570.550 202 7506 85.7 85.8 65.3 88.8 66.6
2012 1711.310 202 8317 94.7 94.8 76.0 96.4 77.4
2013 1533.210 202 7420 84.7 84.9 78.4 86.6 79.9
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-07-30

Previous  (RAJASTHAN-5) (RAJASTHAN-7)  Next