KAIGA-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
Horizontal Pressure Tube type
'Nuclear Power Corporation Of India Ltd.
'Nuclear Power Corporation Of India Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
202 MWe
202 MWe
220 MWe
800 MWt
Construction Start Date First Criticality Date
10 May, 2002
27 Nov, 2010
First Grid Connection Commercial Operation Date
19 Jan, 2011
20 Jan, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
3.53 TW.h
68.9 %
88.9 %
31.1 %
68.0 %
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 1166.350 202 7720 92.6 71.7 71.7 70.5 70.5
2012 1180.550 202 8585 97.7 67.5 69.5 66.5 68.4
2013 1187.630 202 6706 76.6 67.7 68.9 67.1 68.0
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2014-11-25