HEYSHAM-A1
(
Operational
)
Reactor Details
Reactor Type
Model
Owner
Operator
GCR
AGR
Edf Energy
Edf Energy
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
585
MW
e
611
MW
e
625
MW
e
1500
MW
t
Construction Start Date
First Criticality Date
First Grid Connection
Commercial Operation Date
01 Dec, 1970
06 Apr, 1983
09 Jul, 1983
01 Apr, 1989
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
87.95 TW.h
70.8 %
73.9 %
29.2 %
69.9 %
Lifetime performance calculated up to year
2012
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1983
Data from a trial operation not provided
1984
1527.000
600
4718
1985
256.390
621
726
1986
2118.760
621
5731
1987
1887.120
621
6007
1988
1646.390
485
3025
1989
3045.300
420
7113
82.5
100.0
100.0
84.8
84.8
1990
1786.740
510
4096
46.9
43.4
65.7
42.0
58.9
1991
3826.170
621
7279
83.3
86.4
74.7
70.5
63.9
1992
2764.170
550
5981
67.2
55.6
69.3
56.4
61.8
1993
3638.220
560
6643
76.0
74.3
70.4
75.0
64.7
1994
4563.370
575
8128
93.0
90.4
74.1
90.8
69.5
1995
2808.870
575
4794
54.6
55.9
71.3
55.6
67.4
1996
4056.800
575
7674
87.4
80.2
72.5
80.3
69.1
1997
4298.790
575
7757
88.3
84.5
73.9
85.1
71.0
1998
3766.080
575
6950
79.1
73.8
73.9
74.6
71.4
1999
4549.830
575
7990
91.0
89.7
75.4
90.1
73.2
2000
4587.900
575
8230
93.7
90.4
76.7
90.8
74.7
2001
4034.580
575
6959
79.2
77.6
76.8
79.9
75.2
2002
4445.530
575
7921
90.4
87.9
77.6
88.3
76.1
2003
3746.220
575
6783
77.4
74.4
77.4
74.4
76.0
2004
2638.070
575
4951
56.4
52.5
75.8
52.2
74.5
2005
4033.070
575
7458
85.1
80.1
76.0
80.1
74.8
2006
3839.080
585
7229
82.5
75.5
76.0
75.2
74.8
2007
2498.550
585
4892
55.8
49.1
74.5
48.8
73.4
2008
0.000
585
0
0.0
0.0
70.6
0.0
69.6
2009
3478.250
585
6363
72.6
68.4
70.5
67.9
69.5
2010
2826.720
585
5117
58.4
55.1
69.8
55.2
68.8
2011
4627.860
585
8225
93.9
90.5
70.7
90.3
69.8
2012
3749.040
585
7055
80.3
73.4
70.8
73.0
69.9
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2013-06-18
Previous
(HARTLEPOOL-A2)
(HEYSHAM-A2)
Next
UNITED KINGDOM
BERKELEY 1
BERKELEY 2
BRADWELL 1
BRADWELL 2
CALDER HALL 1
CALDER HALL 2
CALDER HALL 3
CALDER HALL 4
CHAPELCROSS 1
CHAPELCROSS 2
CHAPELCROSS 3
CHAPELCROSS 4
DOUNREAY DFR
DOUNREAY PFR
DUNGENESS-A1
DUNGENESS-A2
DUNGENESS-B1
DUNGENESS-B2
HARTLEPOOL-A1
HARTLEPOOL-A2
HEYSHAM-A1
HEYSHAM-A2
HEYSHAM-B1
HEYSHAM-B2
HINKLEY POINT-A1
HINKLEY POINT-A2
HINKLEY POINT-B1
HINKLEY POINT-B2
HUNTERSTON-A1
HUNTERSTON-A2
HUNTERSTON-B1
HUNTERSTON-B2
OLDBURY-A1
OLDBURY-A2
SIZEWELL-A1
SIZEWELL-A2
SIZEWELL-B
TORNESS 1
TORNESS 2
TRAWSFYNYDD 1
TRAWSFYNYDD 2
WINDSCALE AGR
WINFRITH SGHWR
WYLFA 1
WYLFA 2