CEFR (China Experimental Fast Reactor)

Operational


Reactor Details

Reactor Type Model Owner Operator
FBR
BN-20
China National Nuclear Corporation
China Institute Of Atomic Energy
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
20 MWe
20 MWe
25 MWe
65 MWt
Construction Start Date First Criticality Date
10 May, 2000
21 Jul, 2010
First Grid Connection Commercial Operation Date
21 Jul, 2011
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.00 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 2013

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 0.020 20 26
2012 0.000 20 0 0 0 NC 0 NC
2013 0.000 20 0 0 0 NC 0 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2014-11-25