Canada

Summary

Nuclear Power Reactors

0

19

0

6



Annual Electrical Power Production

607541.96 GW.h

(Net, 2013)

96971.22 GW.h

(Net, 2013)
Electricity Production Share in 2013
Non Nuclear Share [%]: 510570.74 GW.h (84.04 %) Nuclear Share [%]: 96971.22 GW.h (15.96 %)

Reactors

Name Type Status Location Reference Unit Power
[MW]
Gross Electrical Capacity
[MW]
First Grid Connection
BRUCE-3 PHWR Operational TIVERTON 730 805 1977-12-12
BRUCE-4 PHWR Operational TIVERTON 730 805 1978-12-21
BRUCE-7 PHWR Operational TIVERTON 817 872 1986-02-22
BRUCE-8 PHWR Operational TIVERTON 817 845 1987-03-09
BRUCE-5 PHWR Operational TIVERTON 817 872 1984-12-02
BRUCE-6 PHWR Operational TIVERTON 817 891 1984-06-26
BRUCE-1 PHWR Operational TIVERTON 772 824 1977-01-14
BRUCE-2 PHWR Operational TIVERTON 734 786 1976-09-04
DARLINGTON-1 PHWR Operational TOWN OF NEWCASTLE 878 934 1990-12-19
DARLINGTON-2 PHWR Operational TOWN OF NEWCASTLE 878 934 1990-01-15
DARLINGTON-3 PHWR Operational TOWN OF NEWCASTLE 878 934 1992-12-07
DARLINGTON-4 PHWR Operational TOWN OF NEWCASTLE 878 934 1993-04-17
DOUGLAS POINT PHWR Permanent Shutdown TIVERTON 206 218 1967-01-07
GENTILLY-1 HWLWR Permanent Shutdown BECANCOUR 250 266 1971-04-05
GENTILLY-2 PHWR Permanent Shutdown BECANCOUR 635 675 1982-12-04
ROLPHTON NPD PHWR Permanent Shutdown ROLPHTON 22 25 1962-06-04
PICKERING-5 PHWR Operational PICKERING 516 540 1982-12-19
PICKERING-6 PHWR Operational PICKERING 516 540 1983-11-08
PICKERING-7 PHWR Operational PICKERING 516 540 1984-11-17
PICKERING-8 PHWR Operational PICKERING 516 540 1986-01-21
PICKERING-1 PHWR Operational PICKERING 515 542 1971-04-04
PICKERING-2 PHWR Permanent Shutdown PICKERING 515 542 1971-10-06
PICKERING-3 PHWR Permanent Shutdown PICKERING 515 542 1972-05-03
PICKERING-4 PHWR Operational PICKERING 515 542 1973-05-21
POINT LEPREAU PHWR Operational SAINT JOHN 660 705 1982-09-11


Above data are from the PRIS database. Last update on 2014-11-23